  • 18.04.2025
    F11 completed. New farms now include 5 buildings with total area of 9,100 m². Equipmentin the first 6 buildings (OLD…
  • 18.04.2025
    F10 completed and populated in September with 10,000 hens and 1,000 roosters. Installednew chick counter and 500 m² equipment washer,…
  • 18.04.2025
    New hatchery wing completed. Installed 18 X Streamer setters (57,600 eggs each) and 9hatchers (19,200 eggs each). Capacity: 1,839,600 setter…
  • 18.04.2025
    Intensive construction year: expanded hatchery by 1,500 m² and built F9 facility (1,700 m²). Admin moved into new hatchery offices.…
  • 18.04.2025
    Facilities F7 and F8 equipped and populated in March with 18,000 hens and 2,000 roosters.Production started in September. Began work…
  • 18.04.2025
    With approval of IPARD project, construction of two new 3,500 m² facilities began and wascompleted by year-end (18,000 hens, 2,000…
  • 18.04.2025
    New hatchery began operation with full approvals. Mid-year, purchased 6 Petersime BioStreamer setters and 3 hatchers. Total capacity: 400,000 eggs…
  • 18.04.2025
    Planned hatchery expansion brought capacity to 810,000 setter and 140,000 hatcher places, producing 240,000 day-old chicks weekly. Constructed a new…
  • 18.04.2025
    Added another PAS REFORM incubator with the same capacity. The hatchery now had 350,000 eggs in setters and 63,300 in…
  • 18.04.2025
    Extended the second facility by 650 m². Introduced a PAS REFORM incubator with a capacity of 36,000 eggs.